Maintains minimum import from grid
Controller logic to prevent feedback to the grid
Connected to utility RTU to provide continuous monitoring of project
Trips breaker if utility conditions violated
Dashboard for monitoring energy production and financials
Solar EPCs developing projects on the secondary spot network in Washington, DC are required by Pepco to meet minimum import requirements. If the instantaneous load goes below the minimum, the controller must trip the breaker.
December 22, 2023
Vybe Energy is providing comprehensive energy management solutions to numerous clients. All Articles